Rivera Drive - Transit Authority of Northern Kentucky

Rivera Drive

The Bellevue/Dayton O Route(s) will operate Detour as the result of Construction starting 2/10/2025.

ROUTES AFFECTED:
EFFECTIVE DATE: 02/10/2025
The Bellevue/Dayton O Route(s) will operate Detour as the result of Construction starting 2/10/2025.