Southbank Shuttle Archives - Transit Authority of Northern Kentucky

Southbank Shuttle ROUTES DIRECTORY

ROUTES AFFECTED: Bellevue/Dayton

Bellevue Temporary Detour

ROUTES AFFECTED:

2X Construction Detour

ROUTES AFFECTED: Industrial Road/Florence Express

42X Temporary Added Trips

ROUTES AFFECTED:

The Bellevue/Dayton I Route(s) will operate Detour as the result of Construction starting 4/24/2025.

ROUTES AFFECTED:

The Bellevue/Dayton O Route(s) will operate Detour as the result of Construction starting 4/24/2025.

ROUTES AFFECTED: Industrial Road/Florence Express

42X Temp Added Trip Time Adjustment

ROUTES AFFECTED: Industrial Road/Florence Express

New 42X Schedule Begins May 17th

ROUTES AFFECTED: All Routes

Get on Board with TANK Newsletter

ROUTES AFFECTED:

Rivera Drive

ROUTES AFFECTED:

Rivera Drive

ROUTES AFFECTED: Airporter, CVG Campus Shuttle

Outbound Wayfair Stop Detour